- According to the premises were handed Owner, the Contractor will carry out the construction work of reinforced concrete pile for the entire range of parts Retaining walls and most eagerly share range from U1 to the end of the tunnel section section of the U3 Tunnel QL10 side of Tunnel Rao
đang được dịch, vui lòng đợi..
