After finished positioning position tim pile, pipe walls down process is done by vibration equipment. There are 2 types of pipe diameter D = 1 m and 1.2 m.
After finishing location positioning spindles heart, the lower casing is done by vibrating equipment. There are 2 types of tube diameter D = 1 m and 1.2 m.