Waste water treatment system E.land Trang Bang operation since March 04/2015. From May 04 to June 08 the normal operation system, wastewater within permit limits. But the sewage 9.10 months exceeded allowable and company E.land company must pay sewage charges Infrastructure excess (September target specific Ammonium = 12.5 mg / l exceeds 1.25 times = 8125 copper / m3 effluent = 21,843,250 VND; October indicators suspended solids = 508m / l reached times = 33.020 VND 5:08 / m3nuoc copper waste = 82,777,838).
Although the company has sent E.land Trang Bang written explanation, please retrieve wastewater sample, please Xiamen Qin company support ... sewage treatment fees. but are still unsupported because the infrastructure has to pay high fees for wastewater treatment state agencies.
Under such situation, Hien propose the applicant company is treated as follows:
As a precaution, avoid Wastewater circumstances beyond the norm, require specialized 01nguoi charge, monitored for timely handling of wastewater goes wrong or wastewater exceeding the quotas. In this way, the company does not cost much for wastewater treatment.
Also please report added, the current 04 factories E.land (Cu, Long An, Binh Duong and Trang Bang), the 03 factories : Cu, Long An, Binh Duong not cook at companies (Canteen bring cooked food in company) wastewater should always be within the limits allowed, not be exceeded. Trang Bang E.land alone can cook for the workers at the company should always be higher wastewater, if negligence, no timely treatment is easily exceeded the norm.
This is a very big problem, affecting to the cost of production and operation of E.land Trang Bang. We look forward to the timely support from the Board of Directors the company to reduce output costs.
Sincerely ./.