2. A 4.1. Prior to:• Check the power: the lamp light curoa phase, motor.• Checking, adjusting the rotation axis height control buttons, rolling about POSITIVE SPIN (FORWARD)• Discharge of water into the ditch.-Eastern beat• Water Discharge ditch filled with pus (continue to the small water flows).• Check the identifiable number of ditches, notes on the table. The check order rolled into signage now rolling to the worker operating the know.2. A 4.2. Operation:• Push the rolling along the rail for rolling axis is in line with the drain pus needs rolling.• Press the blue button for air operations. • When the axis of the camera are, pus on rolling shaft by way of: two above two ditches on either side, rolling beat. Manual put latex over the shaft (not using the leg or steel rod push pus into the air).• When the machine has shut up and drop the shaft into pus track air and pus, water troughs (If using iron hooks, then ditch the sticky latex to drag the backend).2. A 4.3. When there is a problem: • If experiencing failure or stuck emergency shutdown, then LaTeX is as follows: If standing at the top of the ditch, then immediately pressed the Eastern beat need emergency shutdown. If the front of your stand rotate RED button.• When operating the back navigation button, turn on the right, TURN BACK (REVERSE) then turn the blue button brought the pus out of the shaft. shutdown by press the button STOP (STOP) red. Rotate the tuning button towards the POSITIVE SPIN (FORWARD) and then continued to operate as stated above.• When finished rolling a ditch, a shutdown by the STOP button in red, before pushing air away other ditches 2. A 4.4. Finish the work shifts: shutdown, cut the electrical breaker, air hygiene.• Flush out the water in the ditch ditch sanitation, latex clean.
đang được dịch, vui lòng đợi..
