Article 35. The speed control of generating units
1. The generating units in operation must participate in the primary frequency control in the national power system.
2. Generating units of the power plant with installed capacity of 30MW to be equipped on the impact that rapid response speed of the change of system frequency in normal operating conditions. The speed regulator must be able to receive and execute commands increase, decrease or change the power setpoint from SCADA / EMS Unit's operational power system and electricity market, unless the operating unit power system and electricity markets have not requested.
đang được dịch, vui lòng đợi..
