4. list of profile construction drawing design and construction organization measures approved: (See list of each item of works accompanied)5. The modifications in the construction process than designing was browsing: (See list of each item of works accompanied) These changes are consistent with the reality of the scene, make sure the design requirements and do not affect the structure, scale, the use of the work.6. The system of inspection, monitoring and quality assurance measures in the process of monitoring the construction by the owner to hire:Quality management categories – firm Xekaman 1 was done in accordance with:-Law No. 16/2003/QH11 on November 26, 2003 of the National Assembly of the Socialist Republic of Vietnam;-Law No. 50/2014/QH13 18 June 2014 of the National Assembly of the Socialist Republic of Vietnam;-Decree No. 12/2009/ND-CP dated February 12, 2009 by the Government of the Socialist Republic of Vietnam on project management of construction works;-Decree 15/2013/ND-CP on 06/02/2013, Decree No. 46/2015/ND-CP dated 12/5/2015 of the Government on the management and maintenance of the quality of construction works;-Circular No 11/2005/TT-BXD dated July 14, 2005 of the Ministry of construction inspection manual and certificate of conformity of the quality of construction works;-Circular No. 12/2005/TT-BXD dated July 15, 2005 of the Ministry of construction guide some stuff about the quality management of construction works and the capacity of the Organization, individuals in construction activities;-Circular 27/2009/TT-BXD dated 31/7/2009 of the Build Guide and some of the content on quality management of construction works;-Circular No. 10/2013/TT-BXD dated 25/7/2013 of the Build Guide and some of the content on quality management of construction works;-Circular No. 13/2013/TT-BXD dated 15/8/2013 of Ministry of construction on the assessment, appraisal and approval of the design of construction works;-The criteria, standards, process, Vietnam's rules and standards of foreign countries are allowed to apply;-TECHNICAL DESIGN, Online profile base pressure is owner approved in decision No. 06/QD on 3/3/2009;-TECHNICAL DESIGN, Online profile base energy is owner approved in decision No. 06/QD on 3/3/2009;-Based TECHNICAL DESIGN documents of the projects have been approved by the owner;-Profile construction drawing design items have been approved by the owner;-The editing, additional amendments were A, B design and design consultation agreement at the scene throughout the construction process (the minutes of the technical handling of the scene between A, B and design consultant);-Decision No. 26B/QD-CT-KT on 01/10/2010 by company director Xekaman 1 issuance, payment acceptance process, quality management-Xekaman 1 project;-Decision No. 122A/QD-CT-KT on 06/8/2013 of company director Xekaman 1 issuance, payment acceptance process and quality management-Xekaman 1 project;-The standard used in construction and testing (see Appendix No. 1 attached).The work of supervision of supervision:Organization includes quality management Advisory Committee monitoring the Xekaman 1-TVXD 3-Power Joint stock company has the task of:-Organization of constant monitoring of the entire construction jobs the projects in the Xekaman 1 project;-The Organization perform monitoring construction according to the profile design is the approval authority level, in compliance with the legal process, execution and, in compliance with Decree 15/2013/ND-CP on 06/02/2013, Decree No. 46/2015/ND-CP dated 12/5/2015 of the Government on the management and maintenance of the quality of construction works; the rules of the owner;-Coordinate with the related unit (owner, consulting, design, construction units; experimental unit) to timely handling the problems arising in the process of construction.
đang được dịch, vui lòng đợi..