-Welding Line is continuous along the borders between the two constructions are welded, the welding line height not less than the minimum thickness between 2 structures and not less than 6 mm, the welds are full, no pitting, cracks, when South Korea was not melting, physically the basic steel.
đang được dịch, vui lòng đợi..