+ Basic contractor supplies C12 has a browser and construction drawings 90-100%.
→ The dossier prepared by the Contractor C12 browser is quite good.
+ Quality Document: filed on PMU
+ Construction progress: ensuring compared with the overall progress of the project.
đang được dịch, vui lòng đợi..