With water collection plans directly through the cellar door collection of pumping raw water pumping station, the raw water pump station was built just above cellar, which arranged the raw water pump vertical pump or submersible pump to minimize size building pumping stations. House building pumping stations and collection as well as ancillary works built for a capacity of 350,000 m3 / day at the beginning there will be fitted pumps suitable capacity in stages.
receiver direct water
inlets
đang được dịch, vui lòng đợi..