The process of being upgraded, repair times beginning in 1999. In this fix, the bottom of the overflow and the water slope is encased with reinforced concrete. Bridge over the spill are enhanced, expanded to ensure traffic. The canal system was solidified part.
đang được dịch, vui lòng đợi..
