The content and the objective is to identify the needs and priorities of developing medium-term and long-term water supply system for the Ho Chi Minh City 2050 to meet the maximum demand for water for people and production, does not happen of insufficient water supply bases overall planning of water supply systems can make the appropriate investment decision the actual situation at present and in each study period. To achieve this goal, the plan includes the following major contents:
(i) To investigate the current status of data collection the city water supply system, the data on the socio-economic, industrial development planning , urban traffic and the city.
(ii) Collecting, updating water supply projects are implemented.
(iii) Determine the applicable standards of water supply for the city water supply system.
(iv) water demand forecast for each phase of development by 2050
(v) Applied • Financing Watercad tissue formation, Epanet to study patterns, analysis and recommendations developed water transport network, supply network 1, 2 for the city in the period of 2050 and
(vi) Planning and implementation measures overall planning city water supply system. HCM 2050, proposing options thoua chronic OU realize the goals for Technology based on a solid economic Consumer Units.
đang được dịch, vui lòng đợi..
