I've checked the drawing of your company. I think this is the drawing includes the phase 1 and phase 2.After checking I found some discrepancy over the constructions with 30.05.2016 BOMBS. Specific as follows;BH1000 beams * 300 * 30 * 40 * 10590 decreased by 1.RH700 beams * 300 * 13 * 24 * 3590 increased 36.RH700 beams * 300 * 13 * 24 * 4050 increased 18.So, to produce accurate work please check and respond soon for our company.