I sent him the report's execution today. This afternoon, after consultation he had asked me to pause at the No. 1 position with 04 holes drilled length is 48,5m (hard rock sample measured actual 17.5 cm). Tomorrow Unit 1 will carry out the work at the new location. Machine No. 2 and 3 normal working according to the plan set out.
Would you record information,
đang được dịch, vui lòng đợi..