Opinion explanations
Package This is small, short construction period (10 months), a clear scope of work, thus applying the form proposed package deal. Additionally, all packages Supervision consultant (CQS) other projects are subject to the form ADB5 package deal. Because the value of construction equipment and small, this Supervision consultant bid estimate based on the total investment amount Ministry of Agriculture and Rural Development approved small (520 million). Bid estimate must follow the approved EC. CSC has assessed its Short Listing, however, its Short Listing only 2 pages, without the signature of the person authorized by the carrier, not attached CV, not Detailed information for similar projects. Information is insufficient to assess in detail. CSC Short Listing type of firm consistency at the preliminary evaluation stage. The criteria are designed to assess the company's general capacity building of Supervision consultant general and specific capacity building Construction Supervision consultant. Similarity of contract is also considered in the evaluation process. The two companies have different contract number may be similar in scores at the level of general competency assessment Supervision consultant but will differ in specific capacity building Construction Supervision consultant depending on the degree of similarity of contract and apartments according to criteria approved EOI. This is a similar explanation in section 3.2. Its EOI are evaluated according to criteria approved. At this stage we only evaluate the Key - experts of this task (the Engineer / Team Leader and SCADA experts). The expert will be none key detailed assessment stage Profile of contractor proposals. We have built under the bid evaluation criteria based on NEC ADB template. We build more detailed and provide specific criteria to reduce the subjectivity in evaluation.
đang được dịch, vui lòng đợi..