However, at present we only remove the position of female toilets that CGV back compensation for 80,000 dollars. So is totally unreasonable. We have exchanged as well as send mail to Mr. David many times about why we have to add lift to reduce the traffic load for General and TRADE CENTRE serving the CGV in particular so I will not repeat in this email. We propose the compensation level is $ 20,000. We hope to get the cooperation of the CGV to getting this done as soon as possible, the extended time will affect the peak stage of the cinema as well as the peak of the TRADE CENTRE would be detrimental to both sides. We highly expect CGV's cooperation in making decision as soon as possible so that the renovation would go in the right track as planned.