d) press the button control to open the overflow on the console to open the on-demand. During the opening notes the current and voltage of the power. At the same time observe the water flow through the outlet into the area below the hot pepper and recording any abnormality whatsoever. Click the stop control button when the door has reached the required aperture is expressed on the designated location of the door.e) restore normal power supply.f) turn off the generator and put in automatic control mode.g) notes that the operation was carried out in operational log book-shop.h) reported the completion of the procedures for operating the plant. Process for preparation of sluices to test/operationsa) inform staff members operating the stations about the preparation of closing the manhole walls.b) confirmed that the manhole was close the whole and entire open water bulkheads.c) Push the button to close the manhole walls and confirm that the lift had stopped when the sign position of baffled water only open positions (non-zero).d) if applied early cable and lock, barrier controller to indicate that are conditioned to allow active and not active. When applied to any physical area, required the bulkheads do not impact, e.g. remove the glow plugs engine, a manual of operation.e) Sealing and locking the control outlet to indicate that they are conditioned to allow activity.f) notes that the operation was carried out in operational log book-shop.g) reporting process to staff operating the station. The procedure to put the sluices on the safe operating conditionsa) announcements for staff operating the plant about the barrier will be opened and sluices will return to normal operating conditions.b) confirmed the septum and sluices were closed completely or not, close them by pressing the close control and review the winch motor is stopped when the designated location of the baffles open only to zero.c) Insert gaps between walls and sluices.d) When the water level between the septal and sluices using above the reservoir, press the control key to open and determined that the door completely open and water flow through the mouth of the overflow, or lift cranes methodically made for manual operating bulkheads.e) notes that the operation was carried out in operational log book.f) reporting process to staff operating the station.6.8.4 procedures outlet sand (not used) The procedure closes the open discharge of sand is relatively simple and does not have any special precaution that operating personnel must learn.6.8.5 Guide on area of water into the pressure pipe (do not use)a) notified officers operate the factories that van hydrants the pressure pipe preparation are operated to discharge water into the pressure piping.b) Read and record the pressure gauge pipe and the pipe the pressure valve and branch of it was played in its entirety.c) Open the valve on the branch up for allowing the filling pipe pressure often has no water or air to rise.d) check valve vent and pressure measuring instrument pressure pipe.e) when the odometer read pressure equivalent to the air pressure gauge pipe then please confirm that air pressure pipes are not leaking water, and then open the valve pressure pipeline water intentionally and close the valve side branches.f) Enter the implementation process operate in the van.g) reporting process to staff operating the station.
đang được dịch, vui lòng đợi..
![](//viimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)