Climb the stairs or take the elevator up two covered walkways that connect the towers. Originally designed to do walkways for pedestrians when parts of the road car was lifted up, today's walk is on display and exhibition space. Very panoramic with modest fare.The bridge has been raising more than 50 times a day by the hydraulic system of steam to meet the needs of large water transport along the River Thames. Today, the power-operated bridges and stopped traffic when the bridge was raised. Estimate the bridge be raised 1000 times per year.
đang được dịch, vui lòng đợi..