In the case of goods on standard quality no longer required by the Mfg, party B has the right to reject the goods receipt and the responsible party A different shipment change (the same number, on the most recent PRODUCTION batch) quality according to the requirements of the SX, B side.
đang được dịch, vui lòng đợi..
