In the above, the main contractors require subcontractors Daelim 17 accelerate Bridge design and construction drawings completed in late October 2015. However, as he was known to the Britec design unit has pulled out of the project, the bridge has 17 companies attempt to find new design unit and contracted to catch up the progress, costs twice the estimated design compared to the cost of the original design. 17 bridge enterprises will try to meet the design progress at the request of the main contractor and complete Daelim this category in late October 2015. In private, however, some categories of difficulty and problems using the flyover as the ring 2, the bridge across the River, the elite would be pushed back end design in December 2015. (See the detailed progress of construction drawing design submissions).Progress of design launched on the basis of not entangled in terms of interfaces with other packages and the errors of design techniques that the fact the main contractor and the sub-contractors Daelim Industrial Demand 17 also does not resolve. So, progress can be adjusted according to the unity of the party.Daelim main contractor wishes to review and approve progress of construction drawing design.
đang được dịch, vui lòng đợi..