The project was approved under construction since late 2014, is expected to carry out the construction in 15 months. The project period include:
- Leveling: 598m2 scale implementation
- Build towers: The total area is 278m2 with tower 37m height from the floor of the 1st floor, including 7 floors. Total building height compared with 42,5m natural land cos
đang được dịch, vui lòng đợi..