Part 5: IMPLEMENTATION organized counterattack
I. Assigning responsibility for implementing the Scheme
1. MB HTP is the host, the organization implementing the construction project Park-trees, the water in the HTP accordance with the Investment Law, Construction Law, the Law on High Technology and documents legal provisions relating to the management of construction investment.
2. Investors (the investors), the component projects on clusters or subdivision G of stage I and II will be delivered by the Management Board HTP implementation of construction investment, in particular will be: The investor capital construction investment BOT and other modes of cooperation as stipulated by the current legislation on investment and construction.
3. HTP MB guidance on construction investment, procurement, project management, reception handover, operation and use of works in accordance with the provisions of the technical infrastructure, legal documents on construction investment.
II. Investors and construction site
1. Investor:
Do HTP is an economic area - special techniques, as an "urban cottage" has its own specific characteristics which investment in infrastructure construction of phase II general and arrays green will include a variety of works, various works; use of funds raised through the investment channel. So determined:
Management Authority: Board of Management of Saigon Hi-Tech Park.
Investors: As investors are choosing to deploy the green.
2. Investment location:
Phase II - High-tech Zone contiguous Phase I under the master plan and detailed planning of construction 1/2000 Phase II - HTP has approved investment location located in the area of construction: Tang Nhon Phu A ward, Tang Nhon Phu B, Long Thanh My ward, District 9
III. Implementation schedule
1. Time to invest: From 2012 to 2020
2. Progress of the construction project.
The overall progress of the construction of infrastructure in the HTP under Phase II. Specifically:
Progress of the construction of systems and technical infrastructure, the service works and other works of phase II under the plan is expected to pick up to 2020 basically completed. Investment period and this schedule is determined based on the time of investment, construction progress of the entire Phase II and on the basis of objectives: (1) to ensure the investment of time directed by the Prime Minister and the leader of