Launch to supply raw materials to the mill.
Step 1: When the mill outlet temperature above 90 0C, startup groups external circulation 5F1.G14 / G01. The equipment in the group runs in the following order:
- Dust 5F1.BF02 Running
- Running 5F1.BE01 bucket lift
- Running 5F1.VC01 vibrating trough
conveyors Transfer 5F1.BC02 single-action mode for easy adjustment during operation.
Step 2: run the mill motor 5F1.G04 / G01
Step 3: Based on the temperature and pressure output to run the mill feed system 5F1.G02 / G01. The running order of the devices in the group:
- Run rotary feeder valves 5F1.RF01
- Dust 5F1.BF01 Run
- Run conveyor 5F1.BC01