Step 3: INSTALLING the FRAME and PLATE BTCT-The Volume of supplies on barges to the construction location.-Using the crane, workers lift and floor system installation in MIDs + 4.00.-Installation position the frame, the frame against the hanging bar and PC H300.-Use hydraulic jacks lifted up against the frame system + 9,046.-Using the crane, workers lift and fitted a highly BTCT + 4.00. In the past the installation hanging plate BTCT on the frame against cable D10. The BTCT plates are welded together.
đang được dịch, vui lòng đợi..
