tributeabout 1.5 m in diameter, depending on the flow of water flows that have the drain diameter varies according to the design. During the construction of sewer manholes, as well as dig holes in weak land need to close the old tram or iron piles, 1m2 about 25 trees CU tram, the aim is to land subsidence prevention, fixed against the Chargers missed.
đang được dịch, vui lòng đợi..