Nghi Street Area function is quite suitable for the construction of the transfer station by the following reasons:
Road infrastructure is very convenient: a large road surface width (50 m) ,;
Traffic on Route Ham Nghi relatively low;
Many bus lines with the existing route via Ham Nghi should change fewer transit point affect passenger's trip.
Ham Nghi Hubs will serve transit passengers for the route with Highway 16 crossing the Ham Nghi, including 7 line comes from 23/9 Park: line 3, 19, 20, 88, 12, 75, 616 and 9 other routes are: 1, 2, 45, 53, 56, 31, 35, 38, 44. the defensive line is the less affected by the transfer of most transfer station should prioritize the allocation Consulting routes with large passenger volume. The transshipment of passengers performed similar to Ben Thanh station.
đang được dịch, vui lòng đợi..