Sir,The Advisory Letter reference LPk8CHD-16-019 on 18/01/2016 of the appendix for the extended time complete package 8.Text reference number 9786/SGTVT-XD on the scope of coordination of mass duplication of construction project Ho Chi Minh Highway-LT-DG and the project to build road drainage and the nearby Spring. After completion of construction of the sewer line, then the road surface structure of spring Park by Pmu renovating Three Cow channel construction altitudes of project design Ho Chi Minh Highway-LT-DG.Contractor Pack 8 X, Y Branch completed before January 26/2/2015, but not able to hand over the operation because the sewer line project Spring Park Road construction is finished, the cases should the vehicle not be up, down, Y, X branch. (Attach BBNT)After the project "construction of sewer lines and the nearby Spring Mix" complete sewer and road surface, make sure the car up, down, X branch y. on 13/7/2015 project PMU HCM-LT-DG invites handed operation X, Y from the branch on 14/7/2015 (Letter 474/EPMU HLD on 13/7/2015).When put into exploitation the X, Y branch on 14/7/2015, TVGS also approved branch completion date X, Y is on 14/7/2015 as stated in "the certificate handed".So, slow down on 138 (26/2/2015 to 14/7/2015) is caused by the project to build the spring Park road drainage construction, are not able to connect to the X, Y branch to put into exploitation. So this is not the responsibility of the contractor.Looking forward to the review and approval of Mr.Thanks for your cooperation
đang được dịch, vui lòng đợi..