Send Anh Thien
As the ground package construction, ITP requires the coordinates of the point items Ground package but no construction drawings and construction drawings there are other points with CAD drawings to help children by British criticism 6 point coordinates of the station as far as graphics files to the required documents for your records you've attached.
He helped me to criticize these coordinates to reduce editing time and error repair parts drawing coordinates multiple times .
Thank England.
Good health English.
Good English.
đang được dịch, vui lòng đợi..