Contract Price is the full package, cable volume in the table is temporary has included the attrition due to strain the drag, this volume aims to advance payment of supplies to the market. In case the actual cable volume is greater than the volume in the table above contract without due cause the first design change information on side B were not paid for the increased volume.
đang được dịch, vui lòng đợi..