b. to perform docking:Docking of the reinforced concrete structure.*. Insert the nail: -Before mounting the nail lèn nail holes on the bottom of marshes to lay concrete layers lined by design, the liner must be wider than the Roman Empire nail each way from 20-30 cm to adjust the nail. Check the pitch the bottom of the nail by automatic, sure fit design and tolerances allowed in table 1 attached.-How each nail hole edges approximately 5 cm closing round steel four-poster 10-12 mm
đang được dịch, vui lòng đợi..