In the mission to support implementation of the fifth programme on 16/8/2017 at Yen Bai. After checking the records of construction drawing design has been approved, the World Bank (WB) and the Ministry of construction has required additions, repairs. After extensive damage was tender.
đang được dịch, vui lòng đợi..