Asian. Transporting equipment on the floor, lined maintanance bi Statistics avoid damp and falling apart.
B. Check equipment to ensure the engineering design standards. Conduct testing equipment, if possible, to conduct activities for the installation.
C. Positioning device, the sign, using specialized equipment to determine the right balance and short of equipment, conducted the installation of the device into place.
D. The device is mounted to be sure, safe and convenient for manipulation operation.
E. Based on the construction design drawings, check the wiring route marked, identified and extreme functionality of the device match, conducted for the device connection.
F. The joints must meet the requirements for sustainable and exposure to extreme insulation.
G. Internal acceptance testing: Check the circuit, short-circuit the wires and devices online, without incident, the trial tested the device for each room, floor (The switch to shutdown definitely, the light of the lamp to stabilize, engines run smoother, and true to dimensions, outlet to ensure correct voltage, ....). Treatment immediately if there is a problem and retest.
H. PMU invited and conducting acceptance testing Supervision consultant.
đang được dịch, vui lòng đợi..