Water supply source in the operations phase of the project: from Summit Report water plant, water plants, water plants Translation Mai Ngoc HA through the pipeline for water supply transmission 800 available on Pham Van Dong, 600 on the Nguyen Hoang, the pipeline 400hiện have on the Lạc Long Quân and the transmission pipelines culvert D400 new construction goes through the central urban area West of West Lake.
đang được dịch, vui lòng đợi..
