At present, contractors are preparing the conditions for construction of tunnel to Underground Railroad Bridge (finished squeezing pile 02 try BTCT), in which the conditions of power supplies to serve the market. By design, substation SS11-22 250KVA/0, 4KV for pump stations located at tunnel to Underground Railroad Bridge will be connected to substations SS-08 (160KVA 22/0, 4KV) justified in the Km 14 + 750 to grab power from the station. However, current transformer SS-8 yet to be built because the are entangled and the station will be built to provide electricity for the lighting system of the CW3A package. To be able to instal substation SS11 serves construction now and later used for pump stations, contractors propose connected with power from substations to Cat 13 Bi-250KV-22/0, 4KV there (attach drawing options). Contractors Please commit these procedures with the relevant authorities to allow construction, electrical connection and installation of underground cable lines and substations SS11 in accordance with the technical dossier has been approved. Dear Precious recommendations the Board considers, approves plans to build and connect the power source mentioned above, as the basis for contractors to oversee the installation of the station, serving time for the construction category of tunnel to Underground Railroad Bridge.
đang được dịch, vui lòng đợi..