Based on landmarks due to party A hand over at the scene, based on the original coordinate system and the coordinates of the pile construction. Use a total electronic positioning the drill hole construction preparations. The shaft is carefully marked and sent out fixed positions around the school to regularly check tim pile during construction and later transferred
đang được dịch, vui lòng đợi..