Peach ice claws, < = 3 m wide, 2 m = < depth, ground level IIDrain the nail tightly compacted sand cushionThe production and installation of reinforced concrete, steel reinforced manholes, sewer diameter Emperor < = 10 mmProduction of prefabricated concrete structures, concrete, concrete drain lid racks manholes, Marxist 200 mortar, stone rectanglesThe work of production, erection of scrap concrete formwork, formwork, formwork timber Empire tributeErection of precast concrete installation of the Emperor, manholes hatches by craftProvide the pipe installation D C load 400 loe 1 topDrain tube connection insert mortar mortar XM M70Land relief Foundation works, ground level IITransportation located 2 km by car = < dump 5 T-level landConcrete lining manholes nails, plaster rock, 50 4 x 6 labelsOnly 6 brick construction, 5x10, 5x22, manholes Marxist 75 mortar wallManufacture and installation of the frame, steel L63x63x5 steel train stationThick wall plastering, plastering work 2 cm high < = 4 m, Marxist XM 75 mortar:
đang được dịch, vui lòng đợi..
