This morning, we went to check the system, because the employee has informed the operating system does not have enough cold front. After inspection, the main technological system and gas found in a number of gases in the thermal phase of the suspect system. Because we have been two times in two locations where the gas is in a hot place, so the test phase and try to make up for the leakage due to the location of the heat efficiency, there are signs of oxidation.In order to save cost and high efficiency, we propose to put an array of hot stores before (there are 28 stores 24) to replace the hot shop 41.Look, give us your opinion.
đang được dịch, vui lòng đợi..
