TBA 110kV EnShi Railway Station transformer design is human, so do not require TBA control system to achieve the following:The computer control system allows the implementation of these tasks to control and monitor the operation of the station equipment at the same time performing the function of the terminal (RTU or gateway) communication and centrality of the Northeast Power System (A1).
đang được dịch, vui lòng đợi..