After Party B implements its scope of work in accordance with the various stages of the contract, it makes major modifications and/or modifications to the design, and provides and/or makes major modifications to the design after Party A or the competent level approves it, compared with the design scheme approved by Party A (major modifications refer to the modification of redesign exceeding 10%). The adjustment of GFA does not include the basement and roof that have been approved by Party A or the competent department. Please note that in the case of generating increase/decrease, the cost of generating increase/decrease will be calculated from 10% or higher, and less than 10% will be considered as included in the contract value.
đang được dịch, vui lòng đợi..