Masonry Inspection
Checklist
GENERAL 12.1
Any effective quality control program includes mà
phải include the cần reporting inspection to document
the program. The guidelines are given to assist sau the
designer, contractor and inspector on items for Consideration print
the program.
Many items on this unfortunately not apply to một project,
and there lẽ items on a project not included on this được
list. These nên Considered addition to this generic printed
guide. Italics paragraphs theo items elaborate and
Clarify items on the list.
12.2 INSPECTOR'S CHECKLIST
PRE-CONSTRUCTION 12.2.1 VERIFICATION
1. Check những points Against the Plans: .............
(a) Approved Plans ........................ ..............................
(b) Approved specifications ............... .........................
(c) Change Orders and Requests for Information ......
(d) Are deviations allowed by the plan check
engineer? ................................................ ...............
(e) Is continuous inspection cần? .....................
(f) What are the project testing requirements? ..........
(g) Names of Contractors and Suppliers ....................
(h) Review of submittals .. ..........................................
2. Are prism specimens required pre-construction? ........
3. Were pre-construction prism specimens made? ...........
Prior to starting construction, the parties INVOLVED,
Including the masonry inspector, Become familiar with the phải
project. This activity includes Becoming familiar with the
approved Plans and the special conditionsEND_SPAN relating to the
project. The inspector aware of any special nên material
requirements, high strength như masonry units and design
of masonry grout mix.
12.2.2 START UP observations
4. Check materials for: .............................................. ......
(a) Compliance with submittals ..................................
(b) Site storage to avoid contamination ......................
(c) Protection from weather .................. ......................
(d) Consistency ........................ ...................................
Knowing what materials are required and the proper
handling methods will assist the mason and the inspector in the
quality control associated with the project.
5. Check sample panels for: .............................................
(a) Material conformance ...........................................
(b ) ................................................ Workmanship ........
(c) Conformance to plan details .................................
(d ) Observation at proper distance for acceptance .....
The standard material associated with concrete block
construction is ASTM C 90 mà requires observation at a
distance of 20 feet under diffused lighting. This acceptance
requirement applies to sample panels and am also installed work.
12.2.3 PRE-PLACEMENT observations
12.2.3.1 Materials
6. Check the type and quality of the CMU used ....................
7. Concrete Masonry Units Check for: ............................
(a) Overall conformance to applicable material
standard ....... .................................................. ........
(b) Correct size and type (ASTM C 90) .....................
(c) Curing (ASTM C 90) ...........................................
(d) Cleanliness ... .................................................. .......
(e) soundness (ASTM C 90) .................................. ....
8. Check quality of the units by test specimens and
quyết: ....................................... .............................
(a) Is a laboratory test required? ............ .....................
(b) Are any special inspection required Provisions? ...
9. Check unit test requirement, if applicable (Unit
Strength verification, f'm) .................................. ..........
10. Check structure Plans and check compliance with: .....
(a) Strength of masonry ............................... ...............
(b) Stress ............................... ......................................
Most manufacturers have very high concrete block internal
quality control standards to Assure product có có vượt
the requirements set forth in the applicable material standard,
ASTM C 90. The inspector Typically's observation shouldnt
include verification of any special conditionsEND_SPAN, như the
requirement for high strength units. Another example of the
material would be a visual verification check rằng correct
color and texture unit is supplied for the project.
Project 12.2.3.2 Conditions
11. Check for separation giữa buildings ......................
12. Check thickness of walls .............................................
13 . Check the size of bond beams ......................................
14. Check reinforcing steel for: .........................................
(a) Kind and grade ................................................ ......
(b) Size ........................................ ...............................
(c) Location and spacing ............. ...............................
(d) Bracing ............... .................................................. .
(e) ............................................. Clearances ................
(f) Deformation .............................. ..................... ......
(g) Additional requirements around openings steel ....
(h) Placement trong Allowable tolerances .... .............
Some might, beyond the scope như conditionsEND_SPAN site of
the masonry inspector, Tuy nhiên, if the inspector has the insight
mà Coordination with another trade or construction issues can
create a problem, then it is diligent for the inspector to open a
dialogue to resolve the issue is before it Becomes a problem.
15. Check những points for connections ................
(a) Size and location of joist anchors ................... .......
(b) Size, location and number of bolts ........................
(c) Size and location of dowels. ..................................
(d) Location of stirrups .......... .....................................
(e) Veneer ties (if applicable) .... .................................
16. Check the placement of headers and lintels of
masonry material khác ...................................... ..
12.2.4 WORKMANSHIP
Mortar Mixing 12.2.4.1 Observation
17. Check to see clean water is used mà ...........................
18. Check mortar compliance by type and use ..................
19. Are the materials clean and Covered? ..........................
20. Are the manufacturers specifications mixing
followed? ........................................... ..........................
21. Check sand for: .............................................. ..............
(a) Cleanliness ................................ ............................
(b) Quality and fineness ................ ..............................
(c) Aggregate compliance (ASTM C 144) .......... .......
22. Verify mà rõ meets standard cement ................
23. Verify proportions of the mortar mix and time of
mixing ........................................ .................................
24. Is a container of known quantity being used
thay shovel measurement? ..................................
25. Is the correct type of mixer being used? ......................
26. Is mixer operating đúng? ........................................
27. Is the same operator every batch mixing? ....................
28. Is batch or mortar used trong correct time limits? ......
29. Check lime for conformance to applicable
standard ........................................... ............................
30. Check plasticizing agents for conformance to
the material standards .......................................... ..............
31. Verify That admixtures chuẩn những
requirements: ......................................... ......................
(a) Have been approved ...................... ........................
(b) Are đúng proportioned .................... ................
(c) Are not used with plastic cement ......................... .
32. Check the consistency of mortar ..................................
33. Verify That is đúng handled printing mortar mixing .........
34. See mà mortar is not excessively retempered .............
35. Were samples taken for testing? ..................................
36. Are mortar samples required? ......................................
37. Were mortar samples taken, if required? .....................
Mortar can be mixed from the components at the project
site, or it can be blended and shipped to factory the project printing
sacks or silos. For factory-blended mortar, the manufacturers
RECOMMENDATIONS nên followed. Field mixed mortar is
done accordance with the time Provisions printed in the code.
Mortar nên mixed in a paddle type mixer and kept
workable for the mason. Occasionally, mortar samples are
required for testing. Mortar samples spread over a nên
masonry unit for a period of one minute to replicate initial
hydration of the mortar is before it is put Into a cylinder. The
standard for Preparing mortar samples is very detailed in the
Test Preparation procedure. When masonry prisms are
constructed, the mortar is Tested as part of the prism; therefore
the individual samples are Không cần mortar.
12.2.4.2 Grout observations
38. Check grout for: .............................................. .............
(a) Design .............................. mix proportions or ......
(b) Consistency (Slump) ..................................... ........
(c) Compressive strength ..................................... .......
(d) Handling ....................................... ........................
(e) Non-segregation .................... ...............................
(f) Is grout being đặt printing units as rõ? ....... ....
(g) Placement method, high lift or low lift ..................
(h) Proper consolidation ............ .................................
39. Are samples required grout? ........................................
40. Were grout samples taken, if required? .............