12.1 GENERAL
Any effective quality control program that includes
inspection must include the necessary reporting to document
the program. The following guidelines are given to assist the
designer, contractor and inspector on items for consideration in
the program.
Many items on this may not apply to a particular project,
and there may be items on a project that are not included on this
list. These should be considered in addition to this generic
guide. Italics paragraphs following the items elaborate and
clarify items on the list.
12.2 INSPECTOR'S CHECKLIST
12.2.1 PRE-CONSTRUCTION VERIFICATION
1. Check the following points against the plans:.............
(a) Approved plans......................................................
(b) Approved specifications........................................
(c) Change Orders and Requests for Information......
(d) Are deviations allowed by the plan check
engineer?...............................................................
(e) Is continuous inspection necessary?.....................
(f) What are the project testing requirements?..........
(g) Names of Contractors and Suppliers....................
(h) Review of submittals............................................
2. Are pre-construction prism specimens required?........
3. Were pre-construction prism specimens made?...........
Prior to starting construction, the involved parties,
including the masonry inspector, must become familiar with the
project. This activity includes becoming familiar with the
approved plans and the special conditions relating to the
project. The inspector should be aware of any special material
requirements, such as high strength masonry units and design
mix of masonry grout.
12.2.2 START UP OBSERVATIONS
4. Check materials for:....................................................
(a) Compliance with submittals..................................
(b) Site storage to avoid contamination......................
(c) Protection from weather........................................
(d) Consistency...........................................................
Knowing what materials are required and the proper
handling methods will assist the mason and the inspector in the
quality control associated with the project.
5. Check sample panels for:.............................................
(a) Material conformance...........................................
(b) Workmanship........................................................
(c) Conformance to plan details.................................
(d) Observation at proper distance for acceptance.....
The material standard associated with concrete block
construction is ASTM C 90 which requires observation at a
distance of 20 feet under diffused lighting. This acceptance
requirement also applies to sample panels and installed work.
12.2.3 PRE-PLACEMENT OBSERVATIONS
12.2.3.1 Materials
6. Check the type and quality of CMU used....................
7. Check Concrete Masonry Units for:............................
(a) Overall conformance to applicable material
standard.................................................................
(b) Correct size and type (ASTM C 90).....................
(c) Curing (ASTM C 90)...........................................
(d) Cleanliness............................................................
(e) Soundness (ASTM C 90)......................................
8. Check quality of the units by test specimens and
determine:....................................................................
(a) Is a laboratory test required?.................................
(b) Are any special inspection provisions required?...
9. Check unit test requirement, if applicable (Unit
Strength verification, f’m)............................................
10. Check structure compliance with plans and check:.....
(a) Strength of masonry..............................................
(b) Stress.....................................................................
Most concrete block manufacturers have very high internal
quality control standards to assure that their product exceeds
the requirements set forth in the applicable material standard,
typically ASTM C 90. The inspector’s observation should
include verification of any special conditions, such as the
requirement for high strength units. Another example of the
material verification would be a visual check that the correct
color and texture unit is supplied for the project.
12.2.3.2 Project Conditions
11. Check for separation between buildings......................
12. Check thickness of walls.............................................
13. Check the size of bond beams......................................
14. Check reinforcing steel for:.........................................
(a) Kind and grade......................................................
(b) Size.......................................................................
(c) Location and spacing............................................
(d) Bracing..................................................................
(e) Clearances.............................................................
(f) Deformation................................................... ......
(g) Additional steel requirements around openings....
(h) Placement within allowable tolerances.................
Some might consider site conditions beyond the scope of
the masonry inspector, however, if the inspector has the insight
that coordination or construction issues with another trade can
create a problem, then it is diligent for the inspector to open a
dialogue to resolve the issue before it becomes a problem.
15. Check the following points for connections................
(a) Size and location of joist anchors..........................
(b) Size, location and number of bolts........................
(c) Size and location of dowels...................................
(d) Location of stirrups...............................................
(e) Veneer ties (if applicable).....................................
16. Check the placement of headers and lintels of
material other than masonry........................................
12.2.4 WORKMANSHIP
12.2.4.1 Mortar Mixing Observation
17. Check to see that clean water is used...........................
18. Check mortar compliance by type and use..................
19. Are the materials clean and covered?..........................
20. Are the manufacturers mixing specifications
followed?.....................................................................
21. Check sand for:............................................................
(a) Cleanliness............................................................
(b) Quality and fineness..............................................
(c) Aggregate compliance (ASTM C 144).................
22. Verify that cement meets specified standard................
23. Verify proportions of the mortar mix and time of
mixing.........................................................................
24. Is a container of known quantity being used
instead of shovel measurement?..................................
25. Is the correct type of mixer being used?......................
26. Is mixer operating properly?........................................
27. Is the same operator mixing every batch?....................
28. Is batch or mortar used within correct time limits?......
29. Check lime for conformance to applicable
standard.......................................................................
30. Check plasticizing agents for conformance to
material standards........................................................
31. Verify that admixtures conform to the following
requirements:...............................................................
(a) Have been approved..............................................
(b) Are properly proportioned....................................
(c) Are not used with plastic cement..........................
32. Check the consistency of mortar..................................
33. Verify that mortar is properly handled in mixing.........
34. See that mortar is not excessively retempered.............
35. Were samples taken for testing?..................................
36. Are mortar samples required?......................................
37. Were mortar samples taken, if required?.....................
Mortar can be mixed from the components at the project
site, or it can be factory blended and shipped to the project in
sacks or silos. For factory-blended mortar, the manufacturers
recommendations should be followed. Field mixed mortar is
done in accordance with the time provisions in the code.
Mortar should be mixed in a paddle type mixer and kept
workable for the mason. Occasionally, mortar samples are
required for testing. Mortar samples should be spread over a
masonry unit for a period of one minute to replicate initial
hydration of the mortar before it is put into a cylinder. The
standard for preparing mortar samples is very detailed in the
test preparation procedure. When masonry prisms are
constructed, the mortar is tested as part of the prism; therefore
individual mortar samples are unnecessary.
12.2.4.2 Grout Observations
38. Check grout for:...........................................................
(a) Design mix or proportions....................................
(b) Consistency (Slump).............................................
(c) Compressive strength............................................
(d) Handling...............................................................
(e) Non-Segregation...................................................
(f) Is grout being placed in units as specified?...........
(g) Placement method, high lift or low lift..................
(h) Proper consolidation.............................................
39. Are grout samples required?........................................
40. Were grout samples taken, if required?.............
0/5000
Từ: -
Sang: -
Kết quả (Anh) 1: [Sao chép]
Sao chép!
Masonry InspectionChecklist12.1 GENERALAny effective quality control program that includesinspection must include the necessary reporting to documentthe program. The following guidelines are given to assist theDesigner, contractor and inspector on items for consideration inthe program.Many items on this may not apply to a particular project,and there may be items on a project that are not included on thislist. These should be considered in addition to this genericGuide. Italics paragraphs following the elaborate items andclarify items on the list.12.2 INSPECTOR'S CHECKLIST12.2.1 PRE-CONSTRUCTION VERIFICATION1. Check the following points against the plans:.............(a) Approved plans......................................................(b) Approved specifications........................................(c) Change Orders and Requests for Information ... ...(d) deviations Are allowed by the plan checkengineer?...............................................................(e) Is continuous inspection necessary?.....................(f) What are the testing requirements?..........(g) Names of Contractors and Suppliers....................(h) Review of submittals............................................2. Are pre-construction prism specimens required?........3. Were the pre-construction prism specimens made?...........Prior to starting construction, the involved parties,including the masonry inspector, must become familiar with theproject. This activity includes becoming familiar with theapproved plans and the special conditions relating to theproject. The inspector should be aware of any special materialrequirements, such as high strength masonry units and designmix of masonry grout.12.2.2 START UP OBSERVATIONS4. Check materials for:....................................................(a) Compliance with submittals..................................(b) the storage Site to avoid contamination......................(c) Protection from weather........................................(d) Consistency...........................................................Knowing what materials are required and the properhandling methods will assist the mason and the inspector in thequality control associated with the project.5. Check sample panels for:.............................................(a) Material conformance...........................................(b) Workmanship........................................................(c) Conformance to plan details.................................(d) Observation at proper distance for acceptance.. ...The material standard associated with concrete blockconstruction is ASTM C 90 which requires observation at adistance of 20 feet under diffused lighting. This acceptancerequirement also applies to sample panels and installed work.12.2.3 PRE-PLACEMENT OBSERVATIONS12.2.3.1 Materials6. Check the type and quality of CMU used....................7. Check Concrete Masonry Units for:............................(a) Overall conformance to applicable materialstandard.................................................................(b) the Correct size and type (ASTM C 90).....................(c) Curing (ASTM C 90)...........................................(d) Cleanliness............................................................(e) Soundness (ASTM C 90)......................................8. Check the quality of the units by test specimens anddetermine:....................................................................(a) Is a laboratory test required?.................................(b) Are any special inspection provisions required? ...9. Check unit test requirement, if applicable (UnitStrength verification, f'm)............................................10. Check structure compliance with plans and check: ... ... ... ....(a) the Strength of masonry..............................................(b) Stress.....................................................................Most concrete block manufacturers have very high internalquality control standards to assure that their product exceedsthe requirements set forth in the applicable material standard,typically ASTM C 90. The inspector's observation shouldinclude verification of any special conditions, such as therequirement for high strength units. Another example of thematerial verification would be a visual check that the correctcolor and texture unit is supplied for the project.12.2.3.2 Project Conditions11. Check for separation between buildings......................12. Check thickness of walls ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...13. Check the size of bond beams......................................14. Check reinforcing steel for:.........................................(a) Kind and grade......................................................(b) Size.......................................................................(c) the Location and spacing of............................................(d) Bracing..................................................................(e) Clearances.............................................................(f) Deformation................................................... ......(g) Additional steel requirements around openings ....(h) Placement within allowable tolerances so that.................Some might consider site conditions beyond the scope ofthe masonry inspector, however, if the inspector has the insightthat coordination or construction issues with another trade cancreate a problem, then it is diligent for the inspector to open adialogue to resolve the issue before it becomes a problem.15. Check the following points for connections................(a) the Size and location of joist anchors..........................(b) the Size, location and number of bolts ........................(c) the Size and location of dowels...................................(d) Location of stirrups...............................................(e) the Veneer ties (if applicable).....................................16. Check the placement of headers and lintels ofmaterial other than masonry........................................12.2.4 WORKMANSHIP12.2.4.1 Mortar Mixing Observation17. Check to see that clean water is used...........................18. Check mortar compliance by type and use..................19. Are the materials clean and covered?..........................20. Are the manufacturers mixing specificationsfollowed?.....................................................................21. Check sand for:............................................................(a) Cleanliness............................................................(b) Quality and fineness..............................................(c) Aggregate compliance (ASTM C 144).................22. Verify that cement meets the standard specified................23. Verify proportions of the mortar mix and time ofmixing.........................................................................24. Is a container of known quantity being usedinstead of shovel measurement?..................................25. Is the correct type of mixer being used?......................26. Is mixer operating properly?........................................27. Is the same operator mixing every batch?....................28. Is batch or mortar used within the correct time limits?......29. Check lime for conformance to applicablestandard.......................................................................30. Check plasticizing agents for conformance tomaterial standards........................................................31. admixtures Verify that conform to the followingrequirements:...............................................................(a) Have been approved..............................................(b) Are properly proportioned....................................(c) Are not used with plastic cement..........................32. Check the consistency of mortar..................................33. Verify that mortar is properly handled in mixing ... ... ...34. See that mortar is not excessively retempered.............35. samples Were taken for testing?..................................36. Are mortar samples required?......................................37. Were mortar samples taken, if required?.....................Mortar can be mixed from the components at the projectsite, or it can be factory blended and shipped to the project insacks or silos. For factory-blended mortar, the manufacturersrecommendations should be followed. Field mixed mortar isdone in accordance with the time provisions in the code.Mortar should be mixed in a paddle type mixer and keptworkable for the mason. Occasionally, mortar samples arerequired for testing. Mortar samples should be spread over amasonry unit for a period of one minute to replicate initialhydration of the mortar before it is put into a cylinder. Thestandard for preparing mortar samples is very detailed in thetest preparation procedure. When masonry prisms areconstructed, the mortar is tested as part of the prism; Thereforeindividual mortar samples are unnecessary.12.2.4.2 Grout Observations38. Check grout for:...........................................................(a) the Design mix or proportions ... ... ... ... ... ... ... ... ... ... ... ...(b) Consistency (Slump).............................................(c) Compressive strength............................................(d) Handling...............................................................(e) Non-Segregation...................................................(f) Is grout being placed in units as specified?...........(g) Placement method, high lift or low lift..................(h) Proper consolidation.............................................39. Are grout samples required?........................................40. Were grout samples taken, if required?.............
đang được dịch, vui lòng đợi..
Kết quả (Anh) 2:[Sao chép]
Sao chép!
Masonry Inspection
Checklist
GENERAL 12.1
Any effective quality control program includes mà
phải include the cần reporting inspection to document
the program. The guidelines are given to assist sau the
designer, contractor and inspector on items for Consideration print
the program.
Many items on this unfortunately not apply to một project,
and there lẽ items on a project not included on this được
list. These nên Considered addition to this generic printed
guide. Italics paragraphs theo items elaborate and
Clarify items on the list.
12.2 INSPECTOR'S CHECKLIST
PRE-CONSTRUCTION 12.2.1 VERIFICATION
1. Check những points Against the Plans: .............
(a) Approved Plans ........................ ..............................
(b) Approved specifications ............... .........................
(c) Change Orders and Requests for Information ......
(d) Are deviations allowed by the plan check
engineer? ................................................ ...............
(e) Is continuous inspection cần? .....................
(f) What are the project testing requirements? ..........
(g) Names of Contractors and Suppliers ....................
(h) Review of submittals .. ..........................................
2. Are prism specimens required pre-construction? ........
3. Were pre-construction prism specimens made? ...........
Prior to starting construction, the parties INVOLVED,
Including the masonry inspector, Become familiar with the phải
project. This activity includes Becoming familiar with the
approved Plans and the special conditionsEND_SPAN relating to the
project. The inspector aware of any special nên material
requirements, high strength như masonry units and design
of masonry grout mix.
12.2.2 START UP observations
4. Check materials for: .............................................. ......
(a) Compliance with submittals ..................................
(b) Site storage to avoid contamination ......................
(c) Protection from weather .................. ......................
(d) Consistency ........................ ...................................
Knowing what materials are required and the proper
handling methods will assist the mason and the inspector in the
quality control associated with the project.
5. Check sample panels for: .............................................
(a) Material conformance ...........................................
(b ) ................................................ Workmanship ........
(c) Conformance to plan details .................................
(d ) Observation at proper distance for acceptance .....
The standard material associated with concrete block
construction is ASTM C 90 mà requires observation at a
distance of 20 feet under diffused lighting. This acceptance
requirement applies to sample panels and am also installed work.
12.2.3 PRE-PLACEMENT observations
12.2.3.1 Materials
6. Check the type and quality of the CMU used ....................
7. Concrete Masonry Units Check for: ............................
(a) Overall conformance to applicable material
standard ....... .................................................. ........
(b) Correct size and type (ASTM C 90) .....................
(c) Curing (ASTM C 90) ...........................................
(d) Cleanliness ... .................................................. .......
(e) soundness (ASTM C 90) .................................. ....
8. Check quality of the units by test specimens and
quyết: ....................................... .............................
(a) Is a laboratory test required? ............ .....................
(b) Are any special inspection required Provisions? ...
9. Check unit test requirement, if applicable (Unit
Strength verification, f'm) .................................. ..........
10. Check structure Plans and check compliance with: .....
(a) Strength of masonry ............................... ...............
(b) Stress ............................... ......................................
Most manufacturers have very high concrete block internal
quality control standards to Assure product có có vượt
the requirements set forth in the applicable material standard,
ASTM C 90. The inspector Typically's observation shouldnt
include verification of any special conditionsEND_SPAN, như the
requirement for high strength units. Another example of the
material would be a visual verification check rằng correct
color and texture unit is supplied for the project.
Project 12.2.3.2 Conditions
11. Check for separation giữa buildings ......................
12. Check thickness of walls .............................................
13 . Check the size of bond beams ......................................
14. Check reinforcing steel for: .........................................
(a) Kind and grade ................................................ ......
(b) Size ........................................ ...............................
(c) Location and spacing ............. ...............................
(d) Bracing ............... .................................................. .
(e) ............................................. Clearances ................
(f) Deformation .............................. ..................... ......
(g) Additional requirements around openings steel ....
(h) Placement trong Allowable tolerances .... .............
Some might, beyond the scope như conditionsEND_SPAN site of
the masonry inspector, Tuy nhiên, if the inspector has the insight
mà Coordination with another trade or construction issues can
create a problem, then it is diligent for the inspector to open a
dialogue to resolve the issue is before it Becomes a problem.
15. Check những points for connections ................
(a) Size and location of joist anchors ................... .......
(b) Size, location and number of bolts ........................
(c) Size and location of dowels. ..................................
(d) Location of stirrups .......... .....................................
(e) Veneer ties (if applicable) .... .................................
16. Check the placement of headers and lintels of
masonry material khác ...................................... ..
12.2.4 WORKMANSHIP
Mortar Mixing 12.2.4.1 Observation
17. Check to see clean water is used mà ...........................
18. Check mortar compliance by type and use ..................
19. Are the materials clean and Covered? ..........................
20. Are the manufacturers specifications mixing
followed? ........................................... ..........................
21. Check sand for: .............................................. ..............
(a) Cleanliness ................................ ............................
(b) Quality and fineness ................ ..............................
(c) Aggregate compliance (ASTM C 144) .......... .......
22. Verify mà rõ meets standard cement ................
23. Verify proportions of the mortar mix and time of
mixing ........................................ .................................
24. Is a container of known quantity being used
thay shovel measurement? ..................................
25. Is the correct type of mixer being used? ......................
26. Is mixer operating đúng? ........................................
27. Is the same operator every batch mixing? ....................
28. Is batch or mortar used trong correct time limits? ......
29. Check lime for conformance to applicable
standard ........................................... ............................
30. Check plasticizing agents for conformance to
the material standards .......................................... ..............
31. Verify That admixtures chuẩn những
requirements: ......................................... ......................
(a) Have been approved ...................... ........................
(b) Are đúng proportioned .................... ................
(c) Are not used with plastic cement ......................... .
32. Check the consistency of mortar ..................................
33. Verify That is đúng handled printing mortar mixing .........
34. See mà mortar is not excessively retempered .............
35. Were samples taken for testing? ..................................
36. Are mortar samples required? ......................................
37. Were mortar samples taken, if required? .....................
Mortar can be mixed from the components at the project
site, or it can be blended and shipped to factory the project printing
sacks or silos. For factory-blended mortar, the manufacturers
RECOMMENDATIONS nên followed. Field mixed mortar is
done accordance with the time Provisions printed in the code.
Mortar nên mixed in a paddle type mixer and kept
workable for the mason. Occasionally, mortar samples are
required for testing. Mortar samples spread over a nên
masonry unit for a period of one minute to replicate initial
hydration of the mortar is before it is put Into a cylinder. The
standard for Preparing mortar samples is very detailed in the
Test Preparation procedure. When masonry prisms are
constructed, the mortar is Tested as part of the prism; therefore
the individual samples are Không cần mortar.
12.2.4.2 Grout observations
38. Check grout for: .............................................. .............
(a) Design .............................. mix proportions or ......
(b) Consistency (Slump) ..................................... ........
(c) Compressive strength ..................................... .......
(d) Handling ....................................... ........................
(e) Non-segregation .................... ...............................
(f) Is grout being đặt printing units as rõ? ....... ....
(g) Placement method, high lift or low lift ..................
(h) Proper consolidation ............ .................................
39. Are samples required grout? ........................................
40. Were grout samples taken, if required? .............
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.