Dear you pink.According to the production plan, project SOUTH VAN PHONG (310 pipes) will start to connect the tube from on 21/11/2017 at the port Town of ODA fabric.So, your side thanks to the port side of the ODA support Fabric, wood cranes A..., to the connection pipes started as planned and timely progress.What's the matter, you keep side to side.
đang được dịch, vui lòng đợi..