The contractor evaluation and analysis concluded that in this case, the decline wave velocity and energy are due to ultrasonic pipe number 4 and 5 being bent or/and skewed. Furthermore, the contractor has to use other test measures (including the test calculations based on the results of ultrasound and conducted experiments) to prove this pile still satisfy the design requirements. Please see the attached report (for the profile of 2 report here)