Need to dig the soil in each round, each depth not exceeding 1 m. Start digging from the short edge of the nail holes and from the area between the pit and then worked out around.
Need to dig in waves, each wave depth no more than 1 meter. Started digging from the edge of the pit and from short area between the pit and then moving outward progress.