In the first floor (the way to the ground from about 50 m) level of exploitation is 246,000 m ³/day; the next floor (ground from 100 m back down) is 1,440 m ³/day
On the first floor (ie approximately 50 m above the ground) the level of exploitation is 246.000m³ / day; The next layer (from 100 meters above ground and below) is 1.440m³ / day