Rach Mieu bridge right next to the present and is currently about 3 km towards the upstream, this approach are both going through alcohol Thới Sơn, combined with the requirement for boat information gauge and geological conditions in the area, the proposed advisory structure of the Rach Mieu Bridge 2 cross the River as follows :
đang được dịch, vui lòng đợi..