c. conducting research to do the construction drawings.-For categories would need prior to construction, the contractor will implement to do drawing in advance and then proceed up the browser and PMUS TVGS to serve for the construction of the category.-Construction drawing will have to be made in full and in detail the specifications of the installation details such as piping, belt racks, accessories and other equipment.
đang được dịch, vui lòng đợi..