Water environment improvement project in Hu Zhiming basin NGH tofu - dock - Double - boring, the third stage is the drainage system synchronous connection project, sewage treatment is established in the first stage is the tri n said in the second stage, a part in development of rainwater drainage system, is to improve the city environment, improve the decoration. The quality of life of the people, increase the drainage capacity and water transportation line is a dual channel, channel development th ng boring, the drainage system of the rain, because rain flooded state KH C service, Zhao Zhiqiang I in In the flood area, improve the transportation network, the vascular channel to play the most effective improvement of water environment project stage 1 and 2.
đang được dịch, vui lòng đợi..