From the location of the land, using the total electron and machine the average measured drawing topographic map 1/500, the same level of 0.5 m, measurement range draw are as follows:From the boundary (M1, M2) measured 90 m draw out to the highwayFrom the remaining boundary (M4, M5) drawing out 20 m.Measurement methods comply with the current rules and standards.4. The report surveys resultsThe legal basis of establishment documents of the terrain;Brief description of the scale of the project;Content requirements survey the terrain, the volume of actual surveys;The legal processes, using established documentation the terrain;Technical measures to make topographic survey;Analysis, evaluation of conditions of terrain catering to the requirements of the project and the design phase;Conclusion and recommendations;The annexes.-Diary survey.-Map of the project area.D. FUNDING TO PERFORM SURVEYS, GEOLOGYWorth the cost of a survey the terrain, geology of the work package are: 50,000,000 (in words: fifty million). This value includes VAT.
đang được dịch, vui lòng đợi..
