After the meeting on 02/11/2015 in NMXLNT with the participation of the parties concerned. Aims to check the equipment for sewage network systems before commissioning, on 02/11/2015 we went to check again all pit equipment check valve, exhaust valve. all are in good condition and can put into operation the waste water network system in General.
đang được dịch, vui lòng đợi..