aption: 1-meter contribution
2-N2
3-Weighing
4-R410 container terminal
5-vacuum Pump
6-piping
7-Lock Valve fluid lines
Valve Lock 8-station line
9-Port connected to the lock valve
10-valve B
11- C valve
12-valve A
13-fin
erosion terminal 14-Port
15-to the cooler the
16-tube System in the party
17-gas flow
đang được dịch, vui lòng đợi..