II. VALUATION PRINCIPLES1. The evaluation must ensure objectivity, transparency, clarity and caution in the assessment process;2. Data, information, input data parameters used for the calculation of the financial projects, loan repayment schemes are used on the basis of the record, document by the investor provides. 3. right to refuse NHPT project appraisal if in the process of due diligence, the investor does not cooperate, interfere with the survey, Supplement, verify the situation, data concerning the owner and the project owner or provide the information, documents and dishonest.III. SPECIFIC CONTENT The evaluation of projects is done at Headquarters. In other cases, the General Director of the private NHPT instructions. 1. assessment profile Profile evaluation project by the investor provided are specified in annex II-1 of this manual2. assessment process2.1. The reception profile -After receiving the record, according to the assignment of Board leadership within 0.5, VNN working days since the date of the project, officials Ban VNN is responsible for preliminary inspections, the adequacy of records on the basis of reference to catalogue the material specified in annex II. Cases, records are incomplete, invalid according to current regulations, the draft Board officer VNN, suggested additional owner profile (Appendix II. 2-additional assessment profile), the leader of the Board of VNN browse dealership owner. The suggested additions to complete additional required documentation, complete, the time limit for the investor should submit additional records. -Rotation profile: For the record was complete, valid according to the rules, officials Ban VNN draft text sent Ban APPLIED PHYSICAL CHEMISTRY suggest evaluating the content of the project according to the functions and tasks, the leader of the VNN Board browser.2.2. evaluation process 2.2.1. Appraisal: appraisal of investment projects efficiency Within a maximum of 12 days from the receipt of the request of the VNN, officers performed the appraisal the content related to the feasibility, the technical-economic indicators of investment projects; financial projects, loan repayment schemes of the project (according to annex II. 5); reporting evaluation results on the contents which the Board APPLIED PHYSICAL CHEMISTRY leader signed, send the VNN, the Committee leader NHPT.2.2.2. foreign capital management Committee: chaired evaluation projects, financial capability of the client; the draft assessment report writing back the leadership of the Ministry of finance signed NHPT. Within a maximum of 12 days from the date of the opinion of the Evaluation Committee, the officers made the evaluation project profiles, financial capacity and production business of the investor; General evaluation report as annex II. 3-report assessment results, accompanied by the draft text of the report results evaluation of foreign loan projects under annex II. 4, which suggest credit conditions for lending for the project leader report Ban the VNN Director General NHPT browser , sign, sending the Finance Ministry. Content of evaluation include:-Evaluation of project profile, the profile owner: verify its full, legal, valid of the profile; assess the reasonableness, consistency of content, figures in profile; assess the validity of the order issued in writing and signing authority; reviews, reviews the order made, the authority issued the document type, document related to the project. -Evaluation of financial capability of the client: made according to annex II.3. evaluation periodTime evaluation of every project a maximum of 30 days from the date of receipt of the documents enough NHPT legal, valid up to date evaluation report documents sent the Ministry of finance.CHAPTER III: X Y BACK LOAN MECHANISM,SIGNED AUTHORIZATION TO BORROW AGAINI. X Y BACK LOAN MECHANISM 1. where the project subject to assessment: report the results of the evaluation of projects submitted to the Ministry of finance NHPT is official comments about specific back lending conditions for the project. On the basis of evaluation results NHPT, the Finance Ministry decided to review loan conditions specific to the project or report the Prime Minister decided not to arrange funds for the project;2. in case of projects not subject to appraisal, VNN Board presiding, in cooperation with the relevant units of NHPT join comments on the financial mechanism of the project leader NHPT signed send the competent agency. II. SIGNED AUTHORIZATION TO BORROW AGAIN1. principles HĐUQ is the legal basis to NHPT taking steps back lending procedures. NHPT join HĐUQ content due to the Finance Ministry to draft before the formal signing. Participation ensure the following requirements:-In accordance with the current provisions of the law;-In accordance with the provisions of the agreement on funding;-Clearly define roles, responsibilities of the parties regarding the appropriate project authority, functions of each agency as prescribed by law;-Fit the competence, functions of NHPT;-In accordance with the regulation of the profession NHPT, convenient for implementation. 2. process the loan authorization contract back The base text: -The decision of approval of the project authority;-Funding agreement and loan agreement (if any);-The text approved project financing mechanisms;-Circulars or written instructions of the project (if any).VNN Committee reviewing draft content HĐUQ:+ Case HĐUQ draft not yet consistent with the above text, the draft text of VNN Board join the opinion leaders signed the Finance Ministry sent NHPT;+ Case HĐUQ in accordance with the draft texts mentioned above, the Board of the VNN NHPT leaders signed and sent the Bureau and Ministry of finance TCĐN QLN reciprocal sign.
đang được dịch, vui lòng đợi..
